Author: kwhord

September 4: applied with “labor ready” for backup funds now that I have an ID

September 4: applied with “labor ready” for backup funds now that I have an ID

    After I left Labor Ready, I walked around Buchuel, and received an email from my Father…     I was already at Walmart, getting my work gloves and Kneepads, and I requested a ride, I had plans to go downtown and look for lunch at one of the shelters…   My father: Holding…

Read More Read More

September 1, Traveling day 1

September 1, Traveling day 1

After 2 days of packaging, and packing the tools, and life-supplies at the shelter, They are stored and ready for shipment. I repeated the spray foam/zip tied totes that I used to package the roofing tools.  everything is crated like eggs, and should survive a trip through UPS or Greyhound freight with no issues.  …

Read More Read More

August 26, Conference with Theresa and Frank

August 26, Conference with Theresa and Frank

  I’ve been writing about “box” gutters since my first home, on First Street in Louisville KY.  It was a typical 20’s kit house, with a sun room/porch addition which featured a standing seam roof and built-in trough gutters, or as they are known around here: “box” gutters.  I’ve added one of my early post…

Read More Read More

August 6

August 6

“And the Sophia of the Epinoia, being an aeon, conceived a thought from herself and the conception of the invisible Spirit and foreknowledge. She wanted to bring forth a likeness out of herself without the consent of the Spirit, – he had not approved – and without her consort, and without his consideration. And though…

Read More Read More